Zero to Robot Parts in 6 Hours (or so)
All of the robot chassis and super structure parts were completed today and are on their way to West Covina to be welded and then powercoated. The front plugs will be machined tomorrow and will be mailed down to arrive on Tuesday at the same time that the base plates that Mike D from team 233 made for us.
Here is a picture of the 12 different sets of pieces that are on their way down.
Here is a picture of the pieces set next to each other to give you an idea of what it will look like completed.