Day 41: Scrimmage Prep

Field Construction

Work began on assembling the field today. We first opened up all of the shipping pallets containing the field elements and laid them out on the field. The assembling crew started with the low goal. They assembled the two blue low goals and then moved onto the blue high goal. They assembled the goal including the overhang to protect the drive station. They then attached the poles on the truss that represent the limits of the field above the truss. The field team also assembled one of the podiums for the ball to rest on behind the driver station. A few people attached another stabilizing to the base of the polycarb at the end of the truss.

All the Field eLements laid outLow Goals assembledPedestal for the ballMaking the stabilizing barSupport bar will be mounted to the base of the polycarbdHigh Goal was assembledPole for signal lights

Wiring

The wiring team, lead by EJ and Mani, wired the banebot motors that drive the intakes as well as the encoders attached to them. They also wired the VEX button sensors that keep the ball stationary in the intakes. For driving and testing purposes, they wired a single pneumatic tank to the comp robot.

Wiring intake motorsButton sensor wiredIntake motors wired

Bumpers and Driving

The bumpers were successful attached to the practice robot to allow the robot to be driven around and tested.

Zip ties attach bumpers to robot

Coding

The programmers fixed and calibrated the encoders on the drive base

CAD

Travis made some minor changes to the bumpers in the CAD

CAD for bumper

Manufacturing

Parts for the intake encoder mountings and the hot goal sensor mountings were manufactured today. The wooden sides for the bumpers were also manufactured.

Mounts for hot goal sensorsSpacers for intake encodersMaking wooden bumper side panels

Action Items:

  • Finish constructing field
  • Finish building robot
  • Talk to Tom or Jared about programming