First Shots

The robot took its first shots today, shooting racquetballs.  The robot shot extremely far, with distances yet to be officially measured.

For today’s shots, the robot’s tanks were filled by a shop compressor in the lab to approximately 100 psi.  Early next week, we hope to start powering the shots off of the SCUBA tank.

Indexing & Tilting

After many days of work, the robot is almost complete.  Today, we completed the indexing and tilting mechanisms and tested the robot in the lab without a projectile.  The whole system seems to be working great.

Revolver Mounted

A ton of progress was made today on the robot.  The valve block was tapped for the 1″ NPT hose.  Furthermore, we were able to get the pivot shaft for the revolver completed so that we could mount the revolver on the base.

In the next few days, we hope to complete the indexing and tilting actions of the revolver.

Programming, Machining & More

Today, at the lab, we started programming the VEX controller on the robot.  We finished the drive code and wrote simple code to open the main valve for a certain number of milliseconds when a button is pressed.  Furthermore, the VEX controller was wired to the main robot power source after we confirmed with VEX that the controller will run off of 12V.

The main valve block is almost done with machining.  All of the operations on the CNC Mill are complete and all that remains is tapping the pipe threads into the hole for the main hose, which will happen in the next few days.

Today, we got the main hoses in the mail as well as our scuba regulator.  We hooked up the scuba regulator to the high pressure tank and found a 3/8″ UNC fitting that would connect to the regulator.  We then connected it to the low pressure tank with the hose.

Wiring Complete

Today, we completed the wiring on the T-Shirt cannon.  The large gauge wire and the signal wire was run successfully.

Furthermore, we tested the valve,shooting T-shirts and small balls on a test bed outside the lab to test the range of the robot.

Take Flight for Kids Demo

Team 254 and its robot, Devastator, had a great day at the 2010 Take Flight for Kids Festival.  We had hundereds of visitors who all loved the robot.  Some of the younger kids especially liked rolling the balls into the robot’s intake and letting the robot suck the balls up.  We also had a large group of team members at the event, allowing us to manage the crowds and run the robot safely.

Powder Coated and Wiring Started

The robot returned from the powder coat shop today.  The scuba tank also returned from hydrostatic certification after passing its tests.  We hooked it up to a test bed and successfully tested the valve.

The machining on the valve block has begun and is coming along great.  The block will be finished on Sunday.

Wiring on the robot began today.  All of the electronics were mounted on the drivebase and many of the power wires were run.  The large gauge power wires and the signal wires still need to be run.

9411438482_4405a9c5a5_z

Frame Welded

The T-Shirt Cannon’s frame has returned from welding.  The frame was prepped for powder coating today and will be brought to the powder coat shop tomorrow.

The high-pressure scuba tank will be brought to Ace Fire Equipment & Services in East Palo Alto tomorrow to get its hydrostatic certification renewed so that it can be safely filled with high-pressure air.

Frame Ready for Welding

After several days of hard work, the frame of the T-Shirt Cannon is ready to be welded. The framerails have been machined and riveted onto the baseplate.  The superstructure frame has been pinned to the drivebase.  Finally, the mounting blocks for the sideshields have been cut and a welding jig to hold them in place has been made.

The revolver plates have been machined and the tubes inserted between the plates.  Once standoffs to go between the plates are machined, the assembly will be ready to weld.

We will hopefully get welding done early next week.

9409290103_c1b6fe5453_z

Frame Assembly

Today, we received our parts from BAE Systems, one of our sponsors who generously provided machining for this project.  After bringing the parts to the lab, we started assembly.  Furthermore, we cut the stock for the round barrels and began to assemble the revolver assembly, which will be welded next week.

Metal Arrives

The metal arrived at school today and we delivered the aluminum plate to BAE Systems, one of our sponsors.  BAE has generously offered to provide waterjet cutting for our project.  The parts are expected to get cut on Monday.

Meanwhile, at the lab, machining has started on the chassis rails.  They are expected to be complete by next Thursday.

Ordering Material

Today, we compiled the master list of the material that we need to purchase for the robot.  We already have some of the metal at the lab but most needs to be purchased.

After the list was completed, we ordered material which is expected to arrive on Friday.

Final Design

Today, we were able to bring all of the parts of the design together into one completed robot design.

We will be taking a short break from the build of the robot as school starts up again and will resume again during the first week of September.


Superstructure Design

Today, we went through and designed the superstructure frame that would hold the robot together.  We started by looking at our objectives for the superstructure:

  • The superstructure needs to support the revolver and the valve block.
  • The superstructure needs to support the SCUBA tanks.
  • The superstructure should hold the battery.

We took our design objectives and decided that building a frame out of 1/2″ aluminum plate would allow us to build a very strong and light frame.  We designed several interlocking 1/2″ aluminum plates which will be welded to form the superstructure chassis.  The frame will contain cradles to contain the SCUBA tanks as well as bars that will close down on top of the tanks to lock them in place.

9408245259_130e65d4e5_z

Electronics Board Layout

Today, we focused on the design of the electronics board, trying to get the board finalized.  We spent some time physically laying out the electronics, trying to find the best configuration to optimize our wire paths.  Also, we worked extensively on the design of the baseplate to which the electronics mount, finishing its design.

All of the electronics for this robot are made by VEX Robotics, taken from both the VEX Design System and the VEXPro line.

9410832478_bfdfa046e5_z>

Valve Block Design

The design for the T-Shirt Cannon is coming along great.  Today, one group of students started working on a preliminary version of the baseplate that will be used to mount the robot’s electronics.

Another group of students continued to work on the robot’s superstructure, starting to design a block that will serve as the mounting point for the revolver as well as the interface between the air hose and the revolver.  Part of this endeavor was to design an indexing mechanism.  The mechanism envisioned will have a lever with a bearing on the end that will roll into a slot on the revolver to lock it in place.

9408252559_2bfa75975e_z9408342977_a06b1372ab_z

Chassis & Revolver Design

The design for the drivebase is coming along great.  The frame members are mostly modeled and we have started to create the baseplate to which the electronics will mount.

9410857490_ffe99f81c2_z

Today, a separate team broke away from the drivetrain team and started to model the superstructure.  We started with the revolver, modeling a ten-barreled revolver with ten aluminum tube barrels connected with two aluminum plates.  The assembly will be welded.

9408180181_758293edb8_z

Design

Today, we continued to work on the conceptual design of the robot.  Some ideas we had:

  • It is necessary for the robot to be relatively narrow (<30″) so that it can fit through a standard doorway.  We do not have any real restrictions on the length and height of the robot, but to keep it relatively manageable, we intend to keep it under 42″ long.
  • If we moved the drive gearboxes from the center wheels to the back wheels, we could potentially move the scuba tanks lower to the ground and make the whole robot more compact.
In addition to working on general conceptual ideas, we started on the CAD design.  Several students worked to begin modeling the robot’s drivebase.  The plan right now is to build a custom chassis specifically for this robot but to integrate some of the drivetrain components that we already have.

Research & Conceptual Design

Today, we started to wrap up the research phase of our project.  Some stuff we have learned:

  • We found a valve that seems to meet our needs and is in our price range.  We plan to move forward with the purchase of this valve.  The valve is manufactured by MAC Valves.
  • Finding a regulator to regulate the 3000psi air from the scuba tank to working pressure could be expensive.
We started to really start moving on the conceptual design for the robot.  We started sketching out some of our ideas for a general robot design.
  • We decided that indexing the barrels to line up with the hose will be difficult.  We are not sure if a seal will be needed at this connection and we think that it will be important that the revolver is locked in place before the robot shoots.  To accomplish this, we will need some sort of indexing mechanism.  It seems that indexing will be easier with the revolver than with the linear magazine, so we will start looking more seriously at the revolver.
  • We could manufacture a block to interface between the hose (coming from the scuba tank) and the barrels.
  • If we place the two SCUBA tanks flat directly above the drivebase, we will be able to keep the robot compact and low to the ground.

Research Progress

Today, we discussed some of the results of our research and started to talk about general design.  Some of the things we have learned through our research are as follows:

  • To shoot multiple T-Shirts, the best solution seems to be having multiple barrels rather than trying to build a mechanism to reload a single barrel.
  • High speed solenoid valves are expensive and it will be difficult to find one that will fit our requirements while staying in our price range.
  • Every robot we’ve seen that launches T-Shirts from multiple barrels has one valve on each barrel.  We’d like to try to avoid this to cut down on cost.
  • Many T-Shirt shooting robots we’ve seen in the past have used PVC piping and/or PVC sprinkler valves.  PVC is not rated for pressurized gas and is extremely dangerous when used for gas storage.
  • SCUBA tanks seem to be a relatively easy method of air storage.  They can safely hold extremely high pressure air and can be filled inexpensively at many SCUBA stores.
Some design ideas that we discussed.
  • If we can re-use some of the drivetrain parts from past robots, we can save money and reduce the cost of the project.
  • The two choices for barrel design seem to be either a rotating revolver or a linear magazine.
  • If the robot has large wheels, it may be easier to traverse large obstacles.
After this discussion, we spent some time around the lab gathering parts that could be reused on this robot.  We were able to gather two full gearboxes from 2009 as well as the necessary shafts, hubs and sprockets needed to complete the drivetrain.