Build Day 1
After returning from our Kickoff meeting at Bellarmine, Team 254 returned to the lab to start field construction. We sorted through the carpet to find the biggest and least worn continuous pieces and lay them out. They were then seamed together with carpet tape.
We also constructed one of the field “bumps” from the official FIRST drawings using 3/4″ plywood. We then proceeded to place different configurations of wheels on robots and roll them, unpowered, over the bump.
We’re currently looking into building a powered drive train for 8 wheels with rigid frame rails for additional testing.