Manufacturing & Design Progress

MANUFACTURING

The manufacturing team has been working hard to produce a myriad of parts.  The CNC has been running to finish the Dogs and start on parts for the Kicker.  The lathe has been working to produce all of the shafts and spacers needed in the kicker.

DESIGN

The design team has been working hard to design the roller system, the final major robot system to be designed.  The plates will be sent out for waterjet cutting at BAE systems tomorrow.  The CAD predicts the robot weight at about 110 lbs, but does not include certain items such as pneumatic tubing, fittings and all wiring.

Front Roller Design