Frame Ready for Welding

After several days of hard work, the frame of the T-Shirt Cannon is ready to be welded. The framerails have been machined and riveted onto the baseplate.  The superstructure frame has been pinned to the drivebase.  Finally, the mounting blocks for the sideshields have been cut and a welding jig to hold them in place has been made.

The revolver plates have been machined and the tubes inserted between the plates.  Once standoffs to go between the plates are machined, the assembly will be ready to weld.

We will hopefully get welding done early next week.

9409290103_c1b6fe5453_z